Preparation Work Before eo Sterilization

Appearance Inspection: Check for any damage on the surfaces of the main machine, control rack, and electrical control cabinet.
Power Supply Check: Ensure the power supply meets the requirements and check the rotation direction of the water pump and vacuum pump.
Turn on the power and observe whether the instrument display values are normal; otherwise, cut off the power, inspect and repair before restarting.
Pipeline Inspection: Check for leaks in the water supply, vacuum, and medication delivery pipelines, and ensure all valves are in standby mode; adjust if necessary.

Preparation Work Before eo Sterilization Read more

Request For Eto Gas Sterilizer Manufacturer

2.1.1 The overall shape should be precise, with smooth, clean surfaces and uniform color. There should be no burrs, sharp edges, cracks, visible scratches, or unevenness.
2.1.2 All external text, graphics, and symbols must be printed clearly, with precise and durable markings.
2.1.3 Fasteners must be securely installed. All control switches and adjustment knobs (or buttons) should operate smoothly and reliably without obstructions.

Request For Eto Gas Sterilizer Manufacturer Read more

المراقبة الروتينية والتحكم وإطلاق تعقيم أكسيد الإيثيلين

الغرض من المراقبة الروتينية والتحكم في تعقيم EO (أكسيد الإيثيلين) هو إثبات أنه تم تطبيق عملية التعقيم المؤكدة والمحددة على المنتج. يجب تسجيل البيانات من كل دورة تعقيم والاحتفاظ بها لإثبات استيفاء مواصفات عملية التعقيم المؤكدة. ويجب أن يتضمن ذلك المحتوى التالي على الأقل:

المراقبة الروتينية والتحكم وإطلاق تعقيم أكسيد الإيثيلين Read more

انتقل إلى الأعلى