9.1 During ETO Sterilization, operators are not allowed to leave the operating area and must continuously observe the ETO Sterilization process. If any abnormal phenomena occur, the machine must be immediately shut down, and the power supply should be cut off for inspection.
9.2 Change the circulating water in the heating system every three months. When changing the water, first open all water drainage switches at the bottom of the chamber and the lower part of the door to drain the water completely. After rinsing the piping and water tank with clean water, refill with new circulating water.
9.3 Skoðaðu og hreinsaðu loft-, hita-, uppgufunar- og etýlenoxíðkerfissíurnar að minnsta kosti eftir 30 ETO ófrjósemislotur, skiptu um skemmdar eða bilaðar síur. (Hreinsunarmiðlar geta verið vatn, þjappað loft eða gufa.)
9.4 Tómarúmþrýstimælar, þrýstinemarar og önnur mælitæki ættu að kvarða af staðbundinni mælifræðideild á sex mánaða fresti, samkvæmt landslögum um mælifræði.
9.5 Skipta skal um þéttingarþéttingar á sex mánaða fresti.
9.6 Athugaðu reglulega hvort allar klemmutengingar í rafstýrikerfinu séu öruggar.
9.7 At least once a day, inspect the circulation water, vacuum, ethylene oxide, steam, and vaporization device pipelines for leaks. If any leaks are found, measures must be taken to address them safely.
9.8 Lubricate the door hinges once a week and clean the interior walls, door frame, and hinges to ensure no dirt accumulates on the interior walls or hinges.
9.9 If the ambient temperature around the equipment drops below zero degrees Celsius and the equipment cannot operate continuously, if the heating system has stopped heating for more than three hours, the water in the circulation system should be drained to prevent the system from freezing and cracking.
EF ÞÚ VILT VITA MEIRA Um etýlenoxíð ófrjósemisaðgerð
Sími:+8619975258603
Netfang:hayley@hzbocon.com
Staðbundin staður: Herbergi 1202, Caitong Zhongxin, Xiasha District, Hangzhou City, Zhejiang Province, Kína
Vefsíða:hzbocon.com zjbocon.com