ETO स्टेरिलायझर्ससाठी देखभाल मार्गदर्शक

9.1 During ETO Sterilization, operators are not allowed to leave the operating area and must continuously observe the ETO Sterilization process. If any abnormal phenomena occur, the machine must be immediately shut down, and the power supply should be cut off for inspection.

ETO स्टेरिलायझर्ससाठी देखभाल मार्गदर्शक Read more

ईओ नसबंदीपूर्वी तयारीचे काम

Appearance Inspection: Check for any damage on the surfaces of the main machine, control rack, and electrical control cabinet.
Power Supply Check: Ensure the power supply meets the requirements and check the rotation direction of the water pump and vacuum pump.
Turn on the power and observe whether the instrument display values are normal; otherwise, cut off the power, inspect and repair before restarting.
Pipeline Inspection: Check for leaks in the water supply, vacuum, and medication delivery pipelines, and ensure all valves are in standby mode; adjust if necessary.

ईओ नसबंदीपूर्वी तयारीचे काम Read more

शीर्षस्थानी स्क्रोल करा