作者名稱:博康技術團隊

EO滅菌前嘅準備工作

Appearance Inspection: Check for any damage on the surfaces of the main machine, control rack, and electrical control cabinet.
Power Supply Check: Ensure the power supply meets the requirements and check the rotation direction of the water pump and vacuum pump.
Turn on the power and observe whether the instrument display values are normal; otherwise, cut off the power, inspect and repair before restarting.
Pipeline Inspection: Check for leaks in the water supply, vacuum, and medication delivery pipelines, and ensure all valves are in standby mode; adjust if necessary.

EO滅菌前嘅準備工作 閱讀更多

Request For Eto Gas Sterilizer Manufacturer

2.1.1 The overall shape should be precise, with smooth, clean surfaces and uniform color. There should be no burrs, sharp edges, cracks, visible scratches, or unevenness.
2.1.2 All external text, graphics, and symbols must be printed clearly, with precise and durable markings.
2.1.3 Fasteners must be securely installed. All control switches and adjustment knobs (or buttons) should operate smoothly and reliably without obstructions.

Request For Eto Gas Sterilizer Manufacturer 閱讀更多

環氧乙烷殺菌嘅常規監測、控制同釋放

The purpose of routine monitoring and control of EO (Ethylene Oxide) sterilization is to demonstrate that the confirmed and specified sterilization process has been applied to the product. Data from each sterilization cycle should be recorded and retained to prove that the confirmed sterilization process specifications have been met. This should include at least the following content:

環氧乙烷殺菌嘅常規監測、控制同釋放 閱讀更多

碌到頂部